Power

6 independent 11kv three phase electrical supplies are provided from 3 separate national grid substations. Standby Generation is provided at N+1 redundancy via diesel engine driven generators.

On-site fuel is stored to maintain full load operation for all generator sets for continuous running of 24 hours. Back up deliveries are available from diverse supply depots.

Electrical Power Supply

Uninterruptible Power Supply System (UPS) is available to provide N+1 redundancy for critical computer supplies. The UPS can support the facility for 15 minutes at full load, whilst switching to alternate supply, or standby generation start-up/synchronisation takes place.