Power:
• Like all Telehouse data centres, the Magny site benefits from electrical redundancy thanks to two incoming 15MW lines each from a separate power grid substation in order to reduce the risk of power cuts to a strict minimum
• These two main power lines are backed up by 2,000-kVA generator sets (eventually eight in all) deployed in N+1 configuration. These units can provide up to 72 hours back up continuously, due to four 60,000-litre fuel tanks buried under the site. In addition, a bank of four 800kVA inverters in N+1 configuration can ensure thirty minutes of autonomy for the rooms in specified areas
• In the colocation areas, the basic electrical infrastructure is N+1 configuration, expandable to 2x(N+1) on demand. Average power provided is 2kVA, and up to 6kVA (or more on request) can be supplied per rack. Finally, each dedicated room is equipped with a power distribution unit with an average of ten 220V/16A circuit breakers for connecting equipment